Capacity and Permits: Three Hardware Prerequisites

How big is not only a money question; panel capacity, inverter and grid permits decide it.

Updated 2026-11-19 · Formula checked

Three prerequisites

Panel headroom: often needs a 200 A panel or a load calculation.

Inverter type: hybrid handles solar plus battery; grid-tied usually cannot island.

Grid permission: some utilities require registration and limit export.

Choosing capacity

Start with 8 hours of critical loads, then decide about heating.

For backup, buy just enough; extra capacity is expensive and rarely used.

To raise solar self-consumption, match capacity to daily yield or it stays empty.

Sources

Backup or Arbitrage: Two Different PurchasesRead guide

Check your use case first

Five things to check before ordering

How to compare specs

When not to buy

Budget and alternatives

Common mistakes

How we check these numbers

This guide does three things: it breaks costs and conditions into checkable line items, it marks which figures come from official sources, and it flags what varies by city, year or personal situation. We do not treat a single quote as a universal conclusion, and we do not cite percentages we cannot trace.

If you remember one thing: use the checklist here to question quotes, not a single total to compare them.

KEEP READING

Keep reading

Read in order, or jump to another guide on the same topic.

All guides →

None

Top picks

Battery Vendor

Equipment

Check price
Generator

Backup alternative

Check price
Installer

Install

Check price

Affiliate disclosure: this page links to commercial partners; we currently pass no tracking parameters, so we earn no commission from them.

Sources