Time-of-use arbitrage: Save with a critical-circuit list, right-sizing and rebates. Arbitrage depends on rate spread/cycles.
Why it matters
Start with Spread, Cycles; the cost and outcome of time-of-use arbitrage follow from those.
Step by step
- List the circuits and watts you need during an outage.
- Find your time-of-use rates and spread.
- Size capacity for hours and cycles.
- Confirm panel capacity and grid connection permits.
Common mistakes
- Sizing for whole-home backup.
- Ignoring a small rate spread.
- Insufficient panel capacity.
- Missing the warranty throughput limit.
Checklist
- Load/spread/capacity/panel/permits.
- Outage circuit list.
- Rate bill.
- Three quotes.
- Warranty terms.
Who it is for
If budget comes first, protect Spread. and Cycles. before looking at price; cheap but missing key items is not value.
Key facts
- Spread.
- Cycles.
- Windows.
FAQ
Time-of-use arbitrage: Not Overbuying Capacity
Time-of-use arbitrage: Save with a critical-circuit list, right-sizing and rebates. Arbitrage depends on rate spread/cycles.
What should I check before buying a Time-of-use arbitrage?
Arbitrage depends on rate spread/cycles. Key checks: Spread.; Cycles..
Is a Time-of-use arbitrage worth it?
Depends on use, budget and upkeep; a Time-of-use arbitrage is not automatically better because it costs more.
Source: Natural Resources Canada